Autocount Calibration

Creation date: 6/1/2026 9:41 AM    Updated: 6/3/2026 6:06 PM
Verify machine run speed

Check autocount's run speed

Find the ratio by calculating machine/autocount

In plant manager find the gross value for that machine

Find the current calibration value.

Multiply the the current value with the new calibration.

Save the new calibration value.

Have the operator suspend (for mid job changes) or stop the run (for a change between jobs).  (Not doing this will likely cause an issue with reported waste values for the run) 

Find the DMI service for that machine.

Restart the DMI service.

Have the operator resume the run if suspended. 

Have the machine run for at least 80 seconds at desired speed before checking values in autocount compared to the machine's output.

Repeat from the start until difference between autocount and machine values are within the acceptable margin of error.  If values are diverging then you've likely reversed your ratio calculation